Chengdu Anchor Bolt Pull-out Testing Report
author:cst time:2023-07-27
The anchor bolt pull-out testing report includes information such as the client's name, sample quantity, testing date, testing items, testing basis, and testing conclusion.
Client's address: Construction site of Chengdu Expressway, Chengdu City
Sample quantity for testing: 14 anchor bolts
Testing cycle: Testing report will be issued within 7 days.
Testing item: Tensile pull-out capacity.
Testing basis: JGJ 145-2013 Technical Specification for Anchorage of Post-installed Reinforcing Bars in Concrete Structures.
Testing result: The tested items of the commissioned samples meet the client's requirements.
The above is a partial content of the Chengdu anchor bolt pull-out testing report. For more information, please consult the engineer at China Zhonggang Inspection Laboratory.