Yunnan Dali Geogrid Testing Report
author:cst time:2023-07-27
The geogrid testing report includes the following contents: client information, sample quantity, testing date, equipment used, testing criteria, and testing conclusion.
Client address: Dali, Yunnan
Sample quantity for testing: 2 square meters of geogrid
Testing period: The testing report will be mailed within 5 days.
Testing items: Ultimate tensile strength per meter in the longitudinal direction, tensile force at 2% elongation in the longitudinal direction, tensile force at 5% elongation in the longitudinal direction, elongation at nominal tensile strength in the longitudinal direction, ultimate tensile strength per meter in the transverse direction, tensile force at 2% elongation in the transverse direction, tensile force at 5% elongation in the transverse direction, and elongation at nominal tensile strength in the transverse direction.
Testing criteria: JTG E50-2006 Test Specifications for Geosynthetics in Highway Engineering.
The above is a partial content of the geogrid testing report for Dali, Yunnan. For more detailed information, please consult our online engineer.